B 2: Small-scale testing

The objective of this activity is to install and test the system on site, in the bay of Malmfjärden. The dredging system is designed to be automated and therefore this activity was used to adjust and calibrate the system to use it in full scale.

Fler sidor inom life sure project actions

A 1: Planning and preparation

Agreement with suppliersThe planning and preparation included all processes of public tendering and purchase of equ

B1: Construction of dredging equipment and treatment site

Dredging equipment will be constructed to suit the project purpose and objectives.

B 3: Full-scale demonstration

Based on the knowledge of the small scale test, we will perform full scale dredging and treatment.

C 1: Monitoring and evaluation

The focus for monitoring and evaluation is mainly to follow up the effects of the dredging activities.

D 1: Dissemination and networking

How to disseminate the technology and results of Life SURE.

D 2: Replication and transferability

LIFE SURE will ensure that the solutions developed in the project can be used throughout the EU

Senast uppdaterad: 29 maj 2023
Publicerad: 16 maj 2023